Scrutinising Japan's Perovskite Solar Policy

What is the 2040 target of about 20 GW based on?

Suomi Masuda / I-S3 Co., Ltd. | Published 2026-10-29

日本語版(原文)

In November 2024 the Japanese government set a target of installing about 20 GW of perovskite solar cells in Japan by 2040. Two years on, manufacturing subsidies awarded to companies exceed 200 billion yen in approved ceilings, the deployment subsidy has grown to 7 billion yen a year, and government buildings have started to install the cells ahead of the market.

This series checks that policy against the primary record. We read the handouts and minutes of the public–private council, the government-commissioned demand study, the subsidy award lists, the Ministry of the Environment's implementation materials and the Diet record side by side, and we separate what the documents confirm from what remains inference.

This is the English edition. The Japanese pages are the original text; where a chapter has not yet been translated, the link below goes to the Japanese page, which offers machine translation through the language menu. The evidence register, claims register and primary-source list are published as CSV files with Japanese column headings; the evidence IDs (EV, CL, COI, PS) are the same in both languages.

How to read the grades

Each statement carries a grade showing how well it is supported. The EV number after the grade is the row in the evidence register.

GradeMeaning
AConfirmed in a primary source
BCorroborated by two or more independent sources, or a company's own published figure
CA reasonable inference from the sources, including our own calculations
DHypothesis, still being checked
EInsufficient evidence, or refuted

Where people are named, we record only their public roles and publicly disclosed economic interests. That a person or organisation holds more than one role is a different matter from improper influence; the latter is stated only where we could confirm it, together with the evidence.

Chapters

ChapterContentStatus
Chapter 1 Where did 20 GW come from?How the commissioned study estimated demand; a 10-year lifetime versus a 20-year lifetime; a cost estimate that misses the self-sustaining levelEnglish available
Chapter 2 What the council discussedTen council meetings, 40 unpublished handouts, minutes without speaker names, and the eighth meeting that delegated the final text to the chair after one hourJapanese
Chapter 3 Who decided, who receivedCouncil membership and turnover, subsidy recipients, overlaps with award review, industry associationsJapanese
Chapter 4 Comparing generation costs15.3–16.4 yen/kWh in 2040 against 7.9–8.4 yen for silicon; what a 10-year lifetime does to the number; what the 10–14 yen "self-sustaining level" is compared withEnglish available
Chapter 5 Demand created by subsidiesDeployment subsidies at 6.05–7.86 million yen per kW, 100 MW on government buildings, 5–7 GW of public-sector demand, municipal targetsJapanese
Chapter 6 How the press reported itFive major outlets on launch day; "20 nuclear reactors' worth", a phrase absent from the strategy; 3.5 reactors in energy terms; changes in ministry communicationJapanese
Chapter 7 What is happening abroadSeven overseas companies the strategy listed as "under construction or planned", two years later; Saule's shutdown; Hanwha's delay; IEEFA's recommendationEnglish available
Chapter 8 What the same money could have boughtAbout 288 billion yen of published support ceilings; what it buys at 2023 unit costs; a 150–180 billion yen annual cost gap in 2040English available
Chapter 9 Open questions to the governmentFull text of ten questions and the status of repliesJapanese; sent, reply deadline 28 November 2026
Chapter 10 Documents obtained by disclosure requestContent and results of the administrative document disclosure requestsIn preparation

Data

About the company writing this series

I-S3 Co., Ltd. sells and installs crystalline-silicon solar, battery storage and EV charging equipment in Annaka, Gunma Prefecture, Japan. A policy to promote perovskite solar cells affects our business. We state that position first. The series relies only on primary sources and published figures, separates inference from fact, accepts corrections at s_masuda@i-s3.com, and records every correction in the change log on this page. Anyone named in the series may rebut at equal length.

Change log

Deciding whether to put solar on your roof in Japan? We help you weigh waiting for perovskite against installing crystalline silicon now, based on your roof and how you use electricity.

Ask about your own roof

Pages in this series

Citation and reuse

The CSV and Markdown source files (index) are released under CC BY 4.0. You may copy, adapt and use them commercially if you credit I-S3 Co., Ltd. and link to this page. Quotations from the text with attribution are welcome.

Anyone named in this series who wishes to rebut or correct a statement may write to our contact form or s_masuda@i-s3.com; we publish rebuttals at equal length.

Suggested citation

Masuda, S. (2026). "Scrutinising Japan's Perovskite Solar Policy". I-S3 Co., Ltd., published 2026-10-29, https://www.i-s3.com/perovskite-policy-investigation-en.html