Chapter 4 Comparing generation costs

15.3–16.4 yen in 2040 against 7.9–8.4 yen for silicon

Suomi Masuda / I-S3 Co., Ltd. | Published 2026-10-29

日本語版(原文)

Key points

1. The government's own estimate

As reference material for energy policy towards 2040, the working group estimated, on a common set of assumptions, "the cost per kWh of a generating plant newly built and operated in 2040" for each power source. Perovskite solar was included for the first time, treated as a reference value because "the technology is still under development and the predictability of its technology and generation costs is not necessarily high"A · EV-047.

Source2023 (excl. / incl. policy expenses)2040 base case (excl. / incl.)2040 range (excl.)
Perovskite solar (reference value)—15.3 / 16.4—
Solar, utility-scale (250 kW)10.0 / 10.97.9 / 8.46.6–8.4
Solar, residential (5 kW)14.0 / 14.59.9 / 10.17.6–10.4

Yen per kWhA · EV-011, EV-048, EV-049. The ranges depend on whether equipment costs converge to world levels, on deployment scenarios, on learning rates and on whether panel degradation is included. No range is given for perovskite.

Perovskite at 15.3 yen in 2040 is about 1.9 times utility-scale solar and about 1.5 times residential solar in the same year. It is also higher than silicon as of 2023 (10.0 yen utility-scale, 14.0 yen residential)A · CL-024.

2. Reading the assumptions

The assumptions behind the perovskite estimate are as followsA · EV-047.

ItemValueBasis (as stated in the review)
Construction cost, total204,000 yen/kWAnalysed from the cost outlooks of six manufacturers on the council and from FIT/FIP periodic reports on rooftop utility-scale solar installed in 2023
of which equipment (panels)143,000 yen/kWMedian of the six companies' outlooks
of which installation etc.61,000 yen/kWSame
Decommissioning6,000 yen/kW—
Operation and maintenance3,700 yen/kW/yearMedian of FIT/FIP rooftop utility-scale projects
Capacity factor14%Assuming 20% for silicon, analysed from the six companies' efficiency outlooks and the median of rooftop projects
Operating life20 yearsMedian operating life in the six companies' cost outlooks
Size and siting250 kW, rooftopSet for convenience to match the utility-scale solar model plant
Policy expense equivalent to IRR4%No FIT/FIP category exists yet for next-generation cells, so the utility-scale level is borrowed

Three points stand out.

First, most of the numbers come from "the cost outlooks of six manufacturers on the council", the six companies that presented at the second meeting (Chapter 3). The review notes that the companies' outlooks "do not necessarily assume a 250 kW rooftop installation" and that their assumptions "vary". The median of manufacturers' forecasts of their own future product costs has become the government's reference value.

Second, the 14% capacity factor is a rooftop value. The review states that "installation on walls or windows receives less irradiation than on roofs, so the capacity factor falls". The strategy's demand estimate applies a factor of 0.1875 to the wall and window share of domestic demand (Chapter 1), but wall and window costs are outside the scope of the review. The demand-study report gives present costs of 28.0 yen on roofs, 42.9 yen on walls and 57.5 yen on windowsA · EV-007.

Third, integration costs (the cost of handling output variability) were reviewed for utility-scale solar and wind but not for perovskite, which "remains a reference value"A · EV-047.

3. Ten years or twenty

Operating life is one of the assumptions with the largest effect on generation cost. The review's 20 years is the median of six companies' outlooks; in the same review, utility-scale solar is given 25 years and 30 years in a reference case.

The demand-study report (January 2025) uses a 10-year lifetime and an initial cost of about 251,000 yen/kW to calculate present costsA · EV-007. The first product launched (Sekisui Chemical, March 2026) has a published durability of 10 yearsB · EV-025.

What happens when 20 years becomes 10 can be worked out mechanically from the review's breakdown. Of the 15.3 yen for 2040, capital cost (construction 11.2 yen, property tax 1.0 yen, decommissioning 0.2 yen) is 12.4 yen and O&M is 3.0 yenA · EV-047. Capital cost is recovered over the operating life, so at a 3% discount rate, shortening the life from 20 to 10 years raises the annual recovery about 1.74-fold. The 12.4 yen of capital cost becomes 21–22 yen and the total 24–25 yen (the decimals shift with how property tax and decommissioning are treated). This is our calculation using the review's breakdown, not a government estimateC · CL-025.

In other words, at the lifetime of the product now on the market, perovskite in 2040 comes to about 1.7 times residential silicon in 2023 (14.0 yen) and about 1.7 times the upper end of the self-sustaining level, 14 yen. For 15.3 yen to hold, the manufacturers' outlook of a doubling of lifetime by 2040 must come true.

4. What is the 10–14 yen self-sustaining level compared with?

The strategy sets the generation cost at which perovskite solar "can become self-sustaining" at 10–14 yen/kWh and explains the 20 GW as demand at that levelA · EV-002.

That level is 1.3–1.8 times the same government estimate for utility-scale silicon in 2040 (7.9 yen), and equal to or slightly above residential silicon (9.9 yen). "Self-sustaining", then, does not mean reaching the cost of silicon. It refers to the price band at which a certain number of respondents to the demand survey said they would install. Those respondents presumably answered with sites in mind where silicon cannot be installed (low load-bearing roofs, walls, windows), but the survey questions have not been published.

The secretariat paper at the tenth meeting (May 2026) states, in its roadmap illustration, that perovskite solar "is expected to remain higher-priced than existing silicon solar cells" beyond 2040A · EV-053. The government is building the policy on the premise that perovskite will still cost more than silicon in 2040.

The strategy's demand estimate carries another note: "In an estimate under the assumption that deployment proceeds only where the economics of perovskite exceed those of silicon, demand of a certain scale emerges after generation cost falls to about 16 yen/kWh"A · EV-044. Where silicon can be installed, perovskite will not be chosen unless it is cheaper. The 16 yen figure reads as the level at which demand emerges at sites where silicon cannot be installed.

5. Where things stand, and the interim targets

The strategy and the secretariat papers set out the following cost pathA · EV-053, EV-026.

Point in timeFilm typeTandem typeSource
Present (demand study, 10-year life)Roof 28.0 yen, wall 42.9 yen, window 57.5 yen—Demand-study report
2025Technology established for 20 yen—Meeting 10 secretariat paper
2030Technology established for 14 yenTechnology established for 12 yen or belowSame
2030 (manufacturer's outlook)About 20 yen—Sekisui Chemical business briefing (Jan 2025)
2040Self-sustaining level 10–14 yen / government reference value 15.3 yen / secretariat estimate mid-15 yen range—Strategy; working group

"Technology established" does not mean a product sold at that price in that year; it means that the technology enabling that price exists. The first manufacturer to ship describes its 2030 generation-cost outlook as "about 20 yen"A · EV-026. The secretariat's "technology for 14 yen established by 2030" and the manufacturer's "about 20 yen in 2030" are different numbers for the same year.

6. A third-party view

In a November 2025 commentary, the US-based Institute for Energy Economics and Financial Analysis (IEEFA) set the government reference value of 15.3 yen beside 7.6–10.4 yen for residential and 6.6–8.4 yen for utility-scale solar, cited manufacturers' published durability of 5–12 years, and recommended that perovskite be confined to applications where silicon cannot be installed and to tandem cells, with priority given to deploying siliconA · EV-027. IEEFA's recommendation and the situation of overseas manufacturers are covered in Chapter 7.

7. What we know so far, and what we do not

What we know

What we do not know (being checked)

Sources

IDDocument
EV-011, 047, 048, 049Working Group on Generation Cost Verification, "Summary of the generation cost verification" (6 Feb 2025), pp.5, 21–25, 44–45, 66–69, 187
EV-007FY2024 Survey on Demand for Next-Generation Solar Cells, report, p.38 (Jan 2025)
EV-002, 044Next-Generation Solar Cell Strategy, pp.21–22 (28 Nov 2024)
EV-053Tenth council meeting, secretariat paper, p.4 (20 May 2026)
EV-025, 026Sekisui Chemical press release (27 Mar 2026); business briefing Q&A (7 Jan 2025)
EV-027IEEFA, "Japan needs a more nuanced perovskite strategy" (25 Nov 2025)

Unless stated otherwise, costs are in yen per kWh. URLs and retrieval dates for every document are in the evidence register and primary-source list (Japanese).

Deciding whether to put solar on your roof in Japan? We help you weigh waiting for perovskite against installing crystalline silicon now, based on your roof and how you use electricity.

Ask about your own roof

Pages in this series

Citation and reuse

The CSV and Markdown source files (index) are released under CC BY 4.0. You may copy, adapt and use them commercially if you credit I-S3 Co., Ltd. and link to this page. Quotations from the text with attribution are welcome.

Anyone named in this series who wishes to rebut or correct a statement may write to our contact form or s_masuda@i-s3.com; we publish rebuttals at equal length.

Suggested citation

Masuda, S. (2026). "Chapter 4 Comparing generation costs". I-S3 Co., Ltd., published 2026-10-29, https://www.i-s3.com/perovskite-policy-investigation-ch4-cost-comparison-en.html