Explainer videos and articles published in October 2026 (1–28 Oct)

Dynamic wireless charging economics, the JC-STAR★1 grid-code consultation, Japan's FIT/FIP solar support phase-out, a think-tank review, fuel vs battery, and the EU 2035 CO₂ rule. Each topic links to the video and to the article that holds the sources and calculations.

Suomi Masuda / I-S3 Co., Ltd. | Published 30 Oct 2026

Each video condenses a topic into 7–9 minutes; the assumptions, calculations, and sources live in the linked article. Where the article exists only in Japanese, the link opens an automatically translated view. Japanese and Chinese editions of this roundup follow the same order.

This roundup in other languages: 日本語 简体中文

8 topics · 8 videos | Subscribe for new videos | Watch on this site (all videos)

5 Oct 2026

Do the Division First — Japan's Tateyama Wireless Charging Highway, by the Numbers

Public data applied to the Tateyama Expressway dynamic-charging pilot planned from FY2027: even if every large BEV carried a receiver in 2040, 153 vehicles a day would charge, at ¥477/kWh — five times the ¥89 of batteries plus high-power charging.

8 Oct 2026

Japan's Grid Cyber Mandate: Will a JC-STAR Label Protect the Grid? Comment by 6 November

How to file a public comment on the draft revision of Japan's grid-interconnection technical guideline (e-Gov case 620340012), which would make the JC-STAR★1 label a requirement. Deadline 6 November 2026; three filing routes and a per-issue drafting aid.

10 Oct 2026

Field Electrics and Web Crypto, Same Hands — I-S3's 2026 Technology Stack

A 14-language AI desk, a canary that checks itself every morning, quotes sealed with passkey signatures and Cloud KMS, CSP enforced with zero violations, and self-run OCPP and Modbus services — what an installer builds in-house, where vendor technology begins, and lessons from outages.

13 Oct 2026

Japan's 2027 Solar Policy Shift: Land Deeds or Performance? 17 Public Questions to METI

New FIT/FIP support for ground-mounted utility solar ends in FY2027, with 'community-coexistence' projects as the only exception. The line is drawn by land ownership and municipal involvement, not by equipment performance or actual impact. Seventeen public questions to METI's Agency for Natural Resources and Energy, and six recurring argument patterns.

15 Oct 2026

Japan's Solar Policy Reality: Central Myths vs Field Data — A Think-Tank Review Against Primary Sources

Six columns and proposals from Mitsubishi Research Institute — post-FIT, low-voltage aggregation, FIP, grid stability, perovskite, and recycling — checked against primary sources and published figures with the same rigor applied to I-S3's own views. Points of agreement, discrepancies, interests on both sides, and an offer to publish a reply.

17 Oct 2026

JC-STAR★1 Cyber Debate: Will a Compliance Label Protect Japan's Grid? Five Underwriting Checks

Five items that insurance underwriting and lending review cannot learn from a JC-STAR★1 label yet that decide the size of a loss: capacity on one firmware-distribution path, capacity under one administrator credential, fixed minimum operating point and ramp rate, behavior on communication loss, and whether control points are reachable from outside.

17 Oct 2026

The Grid's Fatal Illusion: Why Supply Concentration Makes JC-STAR★1 Fleets a Prime Target

A rule that removes a class of products from the grid raises the value of what remains as a target. Public documents show three conditions converging — supplier concentration, the appearance of 'already secured', and a political context — while the label does not examine the highest-value targets: update servers and signing keys.

23 Oct 2026

Can a Product Label Protect Japan's Grid? JC-STAR★1 vs Boundary Protection in the AI Era

How much of a cyberattack can a JC-STAR label stop? A technical and quantitative review of AI-enabled attack capability, cloud compromise, IEC 62443 boundary protection, and whether tying the label to the grid code is justified. Where a device was made says nothing about who will attack it.